Short answer

A predetermined change control plan, or PCCP, lets a manufacturer get FDA authorization in advance for specific future model changes, such as retraining on new data, together with the methods to develop, validate and implement them. Changes inside the plan need no new submission, while changes outside it do.

Why

A deep learning device would otherwise face a dilemma: retraining on new data may improve it, but a significant change to a cleared device normally needs a new marketing submission. FDA's final guidance on PCCPs for AI-enabled device software functions, first issued in December 2024 and reissued in August 2025, sets out an alternative. The plan has three parts.

A description of modifications lists exactly which changes are planned, for example retraining with data from additional sites or adjusting an operating threshold. A modification protocol describes how each change will be developed, validated and implemented, covering data management practices, retraining practices, performance evaluation and update procedures. An impact assessment weighs the benefits and risks of the changes.

For an engineer, the practical meaning is that retraining becomes a controlled, documented procedure with fixed test datasets, prespecified metrics and thresholds, and version control for data and models, rather than an ad hoc improvement. A plan can even cover changes that software applies automatically, but only those described and validated in it. Changes included in a plan must keep the device within its intended use, and a change outside the authorized plan still needs a new submission.

Other regulators handle this differently, so a device marketed in the EU follows its own rules for significant changes.

A strong answer covers

  • Authorization in advance for specified changes
  • Description of modifications
  • Modification protocol with acceptance criteria
  • Impact assessment
  • Changes outside the plan or intended use need new submission

Common mistakes

  • Believing a PCCP allows any change in the field, rather than only the modifications it describes and validates
  • Treating retraining as routine maintenance with no fixed test set or acceptance criteria